All righty then.
So the build begins. We started the transformation by removing all of the interior. The wooden floor and lower parts of the walls was in worse condition than we thought. And as always, we want to do a proper job so we started to tear out everything. Once the floor is out we can check all the hoses, tubing etc from the engine and drive train. Migh as well fix everything that needs fixing. We will also build a fresh water tank and a waste-water tank. It turns out there’s A LOT of free space under the floor!
November 27, 2010 at 3:49 pm